🌟PREPARATION/GRINDING
Proper preparation and grinding are crucial steps in achieving a successful epoxy flooring installation. This process ensures that the surface is clean, smooth, and ready for the epoxy application. Here are the essential steps involved:
Assessment: Begin by evaluating the existing floor surface. Identify any cracks, pits, or imperfections that need to be addressed before proceeding.
Cleaning: Thoroughly clean the floor to remove dust, dirt, oil, or any contaminants. A clean surface promotes better adhesion of the epoxy.
Repairs: Fill any cracks or holes with an appropriate repair material. Ensure these areas are level with the surrounding surface.
Grinding: Use a concrete grinder to achieve a consistent and smooth surface. Grinding removes any existing coatings, such as paint or sealers, and opens up the pores of the concrete, enhancing epoxy adhesion.
Dust Removal: After grinding, vacuum the area to eliminate all concrete dust. This step is vital to prevent contamination of the epoxy mixture during application.
Moisture Testing: Check for moisture issues in the concrete, as excess moisture can lead to debonding of the epoxy. Use a moisture meter or perform a simple plastic sheet test.
Final Inspection: Conduct a final inspection of the surface to ensure it is debris-free and properly prepared for epoxy application.
By following these preparation and grinding steps meticulously, you can ensure a durable and long-lasting epoxy floor that meets your expectations.
-
Hospitals
Locker Rooms
Restroom
Supermarket
Cleanrooms
Schools
Retail
Laboratories
Pharmaceutical
Lobbies
Cafeterias
Dining Areas
-
PREPARED SUBSTRATES
HEPA VACUUM
CONCRETE GINDER
-
LONG LASTING
SUSTAINABILITY
SLIP RESISTANT
HIGH TRAFFIC
LOW ODER/ LOW VOCS
EASY MAINTANCES
DRIAN COMPATIBLE
DECOREATIVE
CHEMCIAL RESISTANT